Measurements of hydro sound emissions during internal jet cutting during monopile decommissioning
Hinzmann, N. , Stein, P. , Gattermann, J.
March 2017
Conference Paper
Wind Energy , Fixed Offshore Wind
Noise
Rampion Windfarm: Simultaneous piling assessment
HR Wallingford Ltd
July 2016
Report
Wind Energy , Fixed Offshore Wind
Noise
Fish , Marine Mammals
Rampion OWF - Geotechnical Survey, Revision 2 - Final Results Report
EGS Ltd.
June 2016
Report
Wind Energy , Fixed Offshore Wind
Physical Environment
Humber Gateway: Bird Detection Radar Pink-footed Goose Monitoring Autumn 2015
Jones, R. , Peggie, C. , Fouracre, D.
December 2015
Report
Wind Energy , Fixed Offshore Wind
Birds
Dynamic Measurements of Pile Deflections as a Source of Underwater Sound Emissions during Impact Driving of Offshore Pile Foundations
Kuhn, C. , Sychla, H. , Stein, P.
November 2014
Conference Paper
Wind Energy , Fixed Offshore Wind
Noise
Analysis of Marine Ecology Monitoring Plan Data from the Robin Rigg Offshore Wind Farm, Scotland (Operational Year 3): Appendix 2-Birds
Canning, S. , Lye, G. , Kerr, D.
September 2013
Report
Wind Energy , Fixed Offshore Wind
Displacement
Birds
Analysis of Marine Ecology Monitoring Plan Data from the Robin Rigg Offshore Wind Farm, Scotland (Operational Year 3): Chapter 1-Introduction and Executive Summary
Walls, R. , Pendlebury, C. , Lancaster, J.
September 2013
Report
Wind Energy , Fixed Offshore Wind
Displacement , EMF
Birds , Fish
Humber Gateway Offshore Wind Farm: Benthic Monitoring Programme Annual Report and Technical Appendix-Benthic Survey Results
Precision Marine Survey Ltd
May 2013
Report
Wind Energy
Physical Environment
Best Practice Ecological Analysis Methods for Offshore Wind in UK: Case study: Robin Rigg Offshore Wind Farm – An integrated approach the Marine Environmental Monitoring Plan (MEMP)
Walls, R. , Shenton, S. , Knott, E.
February 2013
Conference Paper
Wind Energy , Fixed Offshore Wind
Displacement
Birds , Marine Mammals , Physical Environment
Analysis of Marine Environmental Monitoring Plan Data from the Robin Rigg Offshore Wind Farm, Scotland (Operational Year 1)
Walls, R. , Canning, S. , Lye, G.
January 2013
Report
Wind Energy , Fixed Offshore Wind
Birds , Fish , Invertebrates , Marine Mammals
Rampion Offshore Wind: Non-Technical Summary
RSK Group
December 2012
Report
Wind Energy , Fixed Offshore Wind
Rampion Offshore Wind: Environmental Statement
E.ON
December 2012
Report
Wind Energy , Fixed Offshore Wind
Birds , Fish , Invertebrates , Marine Mammals , Physical Environment
Annex I Survey and Benthic Sampling for the Humber Gateway Offshore Wind Farm
Precision Marine Survey Ltd
August 2012
Report
Wind Energy
Physical Environment
Humber Gateway OWF: Pre-construction Ornithological Monitoring Programme (OMP)
Pendlebury, C. , Garner, G. , Walls, R.
July 2012
Report
Wind Energy , Fixed Offshore Wind
Birds
Rampion OWF Round 3 Zone 6: Migratory Bird Report
Shreeve, A. , Graeme, G.
March 2012
Report
Wind Energy , Fixed Offshore Wind
Birds
West Orkney South Wave Energy Site Environmental Scoping Report
RSK Group
March 2012
Report
Marine Energy , Wave
Robin Rigg Offshore Wind Farm Marine Environmental Monitoring Plan (MEMP): Ecological Analysis Data
Wells, R. , Shenton, S.
November 2011
Presentation
Wind Energy , Fixed Offshore Wind
Birds , Seabirds , Waterfowl , Fish , Invertebrates , Marine Mammals
Rampion Wind Farm: Coastal Processes Assessment
ABP Marine Environmental Research Ltd (ABPmer)
November 2011
Report
Wind Energy , Fixed Offshore Wind
Physical Environment
Pelamis Wave Power P2 Demonstration at EMEC
Pelamis Wave Power
October 2010
Project Site
Marine Energy , Wave
Rampion Offshore Wind Farm - Scoping Report
RSK Group
September 2010
Report
Wind Energy , Fixed Offshore Wind
Greening Blue Energy: Identifying and Managing the Biodiversity Risks and Opportunities of Offshore Renewable Energy
Wilhelmsson, D. , Malm, T. , Thompson, R.
July 2010
Report
Marine Energy , Wind Energy , Fixed Offshore Wind
Humber Gateway Met Mast & Inshore Cable Route Video Survey
Precision Marine Survey Ltd
June 2010
Report
Wind Energy , Fixed Offshore Wind
Robin Rigg Solway Offshore Wind Farm: Bird Monitoring Programme Report No. 8: construction phase bird surveys October-December 2009 and comparison of construction phase data with previous baseline
Percival, S. , Percival, T. , Hartley, C.
February 2010
Report
Wind Energy , Fixed Offshore Wind
Displacement
Birds
Humber Gateway Offshore Wind Farm: Non-Technical Summary of the Onshore Substation and Cable Spur Environmental Statement
E.ON
October 2009
Report
Wind Energy , Fixed Offshore Wind
Robin Rigg Offshore Wind Farm: Mid-Construction Scour and Inter-Array Cable Monitoring Surveys
E.ON
October 2009
Report
Wind Energy , Fixed Offshore Wind
Habitat Change
Physical Environment
Humber Gateway Offshore Wind Farm: Non-Technical Summary of the Offshore Environmental Statement and Onshore Cable Route Environmental Statement
E.ON
April 2008
Report
Wind Energy , Fixed Offshore Wind
Humber Gateway, Environmental Statement
E.ON
April 2008
Report
Wind Energy , Fixed Offshore Wind
Scroby Sands Offshore Wind Farm: Seal Monitoring: Analysis of the 2006 post-construction aerial surveys and summary of the monitoring programme results from 2002-2006
Skeate, E. , Perrow, M.
January 2008
Report
Wind Energy , Fixed Offshore Wind
Displacement
Marine Mammals
Seabird Survey Programme Findings, Humber Gateway Windfarm
University of Hull
September 2007
Report
Wind Energy , Fixed Offshore Wind
Birds
Scroby Sands Seal Monitoring: Analysis of the 2005 Post-Construction Aerial Surveys
Skeate, E. , Perrow, M.
November 2005
Report
Wind Energy , Fixed Offshore Wind
Habitat Change
Marine Mammals , Pinnipeds
London Array Offshore Wind Farm Project: Field Survey Report - Benthic Sampling using Beam Trawls, Otter Trawls and Day Grabs in the Thames Estuary during 2003 and 2004
Centre for Marine and Coastal Studies Ltd (CMACS)
January 2005
Report
Wind Energy , Fixed Offshore Wind
Physical Environment
Scroby Sands Ornithological Monitoring: Assessing the potential impact of the proposed wind farm upon Little tern Sterna albifrons: the construction phase 2004
Perrow, M. , Skeate, E. , Tomlinson, M.
January 2005
Report
Wind Energy , Fixed Offshore Wind
Displacement
Birds
Humber Gateway, Environmental Statement: Section 7, Description of the Physical Baseline Environment
E.ON
January 2005
Report
Wind Energy , Fixed Offshore Wind
Changes in Flow , Habitat Change
Physical Environment
Humber Gateway, Environmental Statement: Section 8, Description of the Biological Baseline Environment
E.ON
January 2005
Report
Wind Energy , Fixed Offshore Wind
Scroby Sands Offshore Wind Farm Environmental Statement
PowerGen Renewables Development Limited (PRDL)
January 2001
Report
Wind Energy , Fixed Offshore Wind
West Orkney South Wave Energy Site
E.ON
Project Site
Marine Energy , Wave