Abstract
As part of the ongoing assessments for the Humber Gateway offshore wind farm periodic video surveys have been carried out in the vicinity of the met mast installed in August 2009 in order to provide some indication of scour. In addition, some further video work has been undertaken at the inshore end of the cable route in order to assess sonar contacts recorded during the geophysical surveys which were originally identified as potential areas of the Sabellaria reef (an annex 1 habitat under the EU Habitats Directive). This report provides a summary of the work undertaken to date with representative stills from the video surveys and some assessment of the status of the seabed areas covered by the surveys.
This document is related to the Humber Gateway Project Site.