Abstract
This Non-Technical Summary covers the first two and therefore summarises the impacts associated with:
• the offshore aspects of the proposed scheme (elements which are below the high tide mark), including the turbines and their foundations,the meteorological masts,the offshore electricity substation,the cables connecting the turbines to the offshore substation and the subsea cables from the substation to the shore (see pages 14-28)
• the onshore aspects of the project, including the cable landfall and the proposed underground cable (see pages 30-38).
A new onshore electricity substation is required for the project near Salt End.This will be the subject of a separate planning application and ES and this will be produced later in the year.
This document is related to the Humber Gateway Project Site.