Abstract
The 2010 Annual Environmental Report for the Thornton Bank Wind Farm Phase 1 documents the ongoing operational activities of six 5M wind turbine generators (WTGs) located 27 km offshore. The report details maintenance, monitoring activities, and preparation for subsequent project phases.
Key environmental monitoring activities included:
- Bathymetric surveys
- Cable route assessments
- Electromagnetic field measurements
- Sedimentation and erosion monitoring
No significant environmental impacts were detected. The report highlights ongoing operational maintenance, safety protocols, and preparations for Phase 2 and 3 of the wind farm development.