TY - RPRT TI - Wind Farm Thornton Bank Phase 1: Annual Environmental Report 2010 AU - C-Power AB - The 2010 Annual Environmental Report for the Thornton Bank Wind Farm Phase 1 documents the ongoing operational activities of six 5M wind turbine generators (WTGs) located 27 km offshore. The report details maintenance, monitoring activities, and preparation for subsequent project phases.Key environmental monitoring activities included:Bathymetric surveysCable route assessmentsElectromagnetic field measurementsSedimentation and erosion monitoringNo significant environmental impacts were detected. The report highlights ongoing operational maintenance, safety protocols, and preparations for Phase 2 and 3 of the wind farm development. CY - Belgium DA - 2016/10// PY - 2016 SP - 13 UR - https://odnature.naturalsciences.be/downloads/mumm/c_power/publicbmmannualreport110315public.pdf LA - English KW - Wind Energy KW - Fixed Offshore Wind KW - Habitat Change KW - Physical Environment KW - Sediment Transport KW - Water Quality KW - Human Dimensions KW - Environmental Impact Assessment ER -