Abstract
The 2016 Annual Report for the Thornton Bank Offshore Wind Farm documents the ongoing operational activities of the fully commissioned 54 wind turbine project. The report highlights maintenance activities, environmental monitoring, and safety performance.
Key activities in 2016 included:
- Major component replacements
- Innovative gearbox oil exchange procedure
- Bathymetric surveys of foundations
- Continued Safety Culture and Health Improvement Campaign
No significant environmental incidents occurred, and the wind farm maintained high operational standards.