Abstract
This report details the three-year post-construction study of the Shiloh I wind power project, the third study of the newer turbine technology in the CMHWRA the previous two year study was conducted at the adjacent High Winds project from August, 2003 through July, 2004 and from August, 2004 through July, 2005). During the first eighteen months (April 10, 2006 to October 15, 2007) of this three-year study, carcass surveys were conducted once per week at every other wind turbine, for a total of 78 rounds at 50 turbines. After this period (October 15, 2007 to April 11, 2009), carcass surveys were conducted at the second half of wind turbines, for a total of 78 complete rounds. Thus, during the 36 month study all turbines were searched at the same search interval and an equal number of times. In addition to reporting the results of the study, we provide details regarding the fulfillment of the Solano County Use Permit U-03-06, specifically Condition 40.