Abstract
As a result of the Danish Government's Energy Plan 21 a target of 5,500 MW wind power is to be erected in Denmark by 2030. 4,000 MW of these are to be placed offshore in special pointed areas with minimal impacts on the environment. In 1998 the Danish Ministry of Environment and Energy ordered two power companies, Elsam and Energi E2, to establish each a demonstration wind farm at one of the five pointed areas. The intention was to follow the environmental impacts from the wind farm and to evaluate the possibility of setting up about 1,500 MW in each area with as little impact on the environment as possible. In 1999 the two power companies were given approval to begin pre-studies of each of the two wind farms and the work on the site construction as well as the environmental impact assessment related hereto was initiated. The authorities made a number of requirements for the EIA surveys according to the EU-directive for preparation of EIA reports. In the summer of 2000 the EIA report with project description was submitted to the authorities and the project was approved in the spring of 2001. During the summer and autumn of 2001 orders were placed for the components for the wind farm, i.e. foundations, towers, wind turbines, cables etc. After having finalised the EIA, monitoring programmes of the wind farms were initiated on basis of the results of the surveys carried out during the EIA. This means that continuous surveys have been implemented for most of the environmental parameters from 1999 and till today. This annual status report for 2001 is to present the results from the annual environmental monitoring programme (the baseline studies) at Horns Rev, which form part of the monitoring programme set up for the Horns Rev project. To get a complete picture of the Danish monitoring programme for the national demonstration wind farm project it is necessary to see the report for Horns Rev and for Roedsand as a whole. The report comprises a description of the wind farm project at Horns Rev, the environmental management system connected to the project, description and conclusion of each environmental monitoring project ending with a short description of the programme for the environmental surveys in the area in 2002. (au)