Abstract
This Piling Strategy (PS) has been prepared to address the specific requirements of the relevant conditions attached to Section 36 Consent and Marine Licences issued to Beatrice Offshore Windfarm Limited (BOWL).
The overall aim of the PS is to present the means by which the effects of underwater noise resulting from piling activity on marine mammals and fish are to be mitigated during the construction of the Beatrice Offshore Wind Farm and Offshore Transmission Works (OfTW).
All BOWL personnel and contractors involved in the Beatrice Project must comply with the mitigation measures and procedures presented in this PS.
This document is related to the Beatrice Offshore Wind Farm Project Site.