Abstract
This document is being provided in line with the commitment made within the Project Environmental Monitoring Plan (PEMP) (Moray East, 2018) where it is stated that a summary of the pre-construction surveys will be provided upon completion of the analysis of the full pre-construction survey campaign (Section 2.6). The results of the 2010 geophysical and geotechnical surveys have been included within the Moray East Environmental Statement (ES) 2012 and therefore are not referred here. The layout of this document will divide the surveys completed in both the Moray East site and OfTI Corridor for clear representation.
This document is related to the Moray East Offshore Wind Farm Project Site.