Abstract
This document is the pre-construction Environmental Monitoring Plan for Phase 1 of the London Array project. An Environmental Plan for subsequent phases of the wind farm development will be produced and submitted accordingly, and following a recommendation from the Ornithological Review Panel that these phases can go ahead. It is based on the requirements of the FEPA License (32945/09/0)
The document is intended to provide details on:
• The range of environmental monitoring proposed for the project;
• The specifications of the proposed monitoring;
• The provisional programme for all proposed monitoring; and
• The proposed approach to reporting and presenting the findings of these surveys.
This document is related to the London Array Project Site.