Abstract
It is presently anticipated that the main power cable or cables to shore from the proposed LAL offshore windfarm be laid up the beach in the general area of Cleve Marshes. Provisional cable routes were provided to CMACS Ltd by the client, and intertidal surveys of the area carried out following consultation with the owner of the area, Kent Wildlife Trust, and English Nature.
This document is related to the London Array Project Site.