Abstract
A Development Consent Order (DCO) was awarded to Hornsea Three on 31st December 2020.
Part 2 of Schedule 14 of the Hornsea Three DCO (the DCO) outlines the required benthic compensation measures which must accord with the Sandbanks Compensation Strategy1 and be drafted into separate Sandbank Implementation Plans (SBIPs) for the North Norfolk Coast (WNNC) Special Area of Conservation (SAC) and North Norfolk Sandbanks and Saturn Reef (NNSSR) SAC and submitted to the Secretary of State for approval.
This document is related to the Hornsea 2 Offshore Wind Farm Project Site.