Abstract
Elsam and Eltra built the offshore demonstration wind farm at Horns Rev in the North Sea. Elsam is the owner and is responsible for the operation of the wind farm. Eltra is responsible for the connection of the wind farm to the national onshore grid. In the summer months of 2002, Elsam constructed the world's largest offshore wind farm off the Danish west coast. The wind farm is sited 14-20 km into the North Sea, west of Blaevands Huk. The first wind turbine was erected in May 2002 and the last wind turbine tower of a total of 80 was in place by August 2002. The construction work was completed with the last connecting cables sluiced down in September 2002. All the wind turbines were in production by December 2002. The expected impact of the wind farm will primarily be an alternation of habitats due to the introduction of hard bottom substrates as wind turbine towers and scour protections. A continuous development in the epifouling communities will be expected together with an introduction of new or alien species in the area. The indigenous benthic community in the area of Horns Rev can be characterised by infauna species belonging to the Goniadella-Spisula community. This community is typical of sandbanks in the North Sea area, although communities in such areas are very variable and site-specific. Character species used as indicators for environmental changes in the Horns Rev area are the bristle worms Goniadella bobretzkii, Ophelia borealis, Psione remota and Orbinia sertulata and the mussels Goodallia triangularis and Spisula solida. In connection with the implementation of the monitoring programme concerning the ecological impact of the introduction of hard substrate related to the Horns Rev Wind Farm, surveys on hard bottom substrate was conducted in March 2003 and in September 2003. This report describes the first year results of surveys on hard substrate after the completion of the offshore wind farm at Horns Rev.