Abstract
As part of a post-construction sampling programme to partially discharge Condition 27 of the Beatrice OWF Section 36 consent, APEM Ltd was commissioned by Beatrice Offshore Windfarm Ltd (BOWL) to undertake a Remotely Operated Vehicle (ROV) and Drop Down Video (DDV) survey at the Beatrice Offshore Wind farm (OWF) site in October 2020. These two techniques were utilised to gather qualitative data for community composition of biofouling on the turbine jacket legs, and epibiota on the surrounding seabed. This survey was conducted alongside a benthic grab survey within the OWF site and the results of that survey are reported in APEM (2021).
This document is related to the Beatrice Offshore Wind Farm Project Site.