Abstract
This Wind Farm Construction Method Statement (CMS) has been prepared to address the specific requirements of the relevant conditions attached to Section 36 Consent and Marine Licences issued to Beatrice Offshore Windfarm Limited (BOWL).
The overall aim of the CMS is to set out construction procedures and good working practices in relation to the installation of the Wind Farm and Offshore Transformer Modules (OTMs), noting that a separate CMS will set out the equivalent for the offshore export cable.
The CMS confirms that the construction procedures to be employed align with those considered in the original Application, and that construction-related mitigation measures detailed in the Application will be applied during installation.
All method statements developed by contractors involved in the Beatrice Project must comply with the procedures set out in this CMS.