Management Measures Tool for Marine Energy

OES Environmental Logo

Accessing Management Measures that Support Deployment of Wave and Tidal Energy Devices

As the marine renewable energy (MRE) industry moves beyond deployment of individual wave and tidal energy devices towards arrays, certain risks of MRE devices on the marine environment are not well understood and have led to onerous monitoring requirements placed on device developers.

A workshop was held in May 2017 with researchers, regulators, and developers to create the basis for the tool shown below. In consultation with the research and regulatory communities, it was agreed that applying a set of robust management measures could act as safeguards for marine animals and habitats until available monitoring data allows for determining the level of risk from MRE devices. At that point, measures could be dialed back or removed, if warranted. More information on the workshop and input for the tool can be found here.

The Management Measures Tool for Marine Energy shows management (or mitigation) measures from past or current MRE projects as a reference to help manage potential risks from future projects and allow them to move forward in the face of uncertainty, or until a risk can be retired. Additional management measures are regularly added by the OES-Environmental team. In addition to the searchable tool below, the information can be downloaded here. The download file includes additional details not shown below, including comments from stakeholders on past experience, cost of management measures, and when a management measure is needed.

View the instructions document for more in-depth details and examples on how to use the Management Measure Tool for Marine Energy or check out this webinar for an overview and demonstration of the tool. 

*Information in advantages and challenges comes from a SEA Wave report, and may also include information from the listed project documents.

Last updated June 2024

Displaying 201 - 300 of 339 management measures
Technology Project Phase Stressor Receptor Management Measure Advantages Challenges Project Documents
Wave, Tidal Operation & Maintenance Entrapment

Potential risk of entrapment within device chambers and mooring arrays.

Reptiles
Mitigation

Release entrapped animal.

None identified

None identified

Wave, Tidal Installation, Operation & Maintenance, Decommissioning Displacement

Potential displacement of essential activities due to the presence of devices and associated moorings/support structures.

Benthic
Design feature

Array/mooring configuration designed to avoid migratory routes or other important sites.

Minimizes risk of development creating displacement by avoiding migratory routes or other important sites.

May be inconsistent with optimal layout of the development for exploitation of the energy source.

Can be a costly measure when scaling up to larger arrays.

Aquamarine Power Ltd 2011, Davison and Mallows 2005, Fox 2019, Oyster 800 at EMEC, Strangford Lough - MCT (SeaGen)
Wave, Tidal Installation, Decommissioning Airborne noise

The potential effects from airborne noise generated during installation/construction (excluding piling).

Birds
Seabirds
Mitigation

Avoid/limit 'noisy works' within close proximity to sensitive sites (e.g., known seal haul outs and important cliff nesting sites) during sensitive periods, defining appropriate clearance distances where necessary.

Could reduce potential effects on sensitive species during sensitive periods.

Could increase project construction timescales (e.g., if continuous drilling time is restricted or specific periods need to be avoided) and may increase costs.

OpenHydro and SSE Renewables 2013, Aquatera Ltd 2011, Foubister 2005, Royal Haskoning and Sea Generation (Kyle Rhea) Ltd. 2013, SSE Renewables 2011, ScottishPower Renewables 2012, McGrath 2013, Orbital Marine Power 2014, The Marine Institute 2016, Federal Energy Regulatory Commission (FERC) 2020, THETIS Energy 2009, Wello Penguin at EMEC, EMEC Fall of Warness Grid-Connected Tidal Test Site, Kyle Rhea Tidal Stream Array Project, Westray South Tidal Project, Fair Head Tidal Array, Galway Bay Test Site, PacWave South Test Site, Torr Head Project
Wave, Tidal Operation & Maintenance Entanglement

Potential for marine animals to become entangled in device mooring lines and cables.

Birds
Diving birds
Design feature

Maintain taut mooring lines.

Remove/reduce risk of entanglement.

Regular inspections can provide operational insight into condition, and help track effects/interaction with marine animals.

Mooring design driven by technical and commercial consideration.

Regular ROV/dive or drop-down camera inspections required.

Aquatera Ltd 2011, Federal Energy Regulatory Commission (FERC) 2020, Wello Penguin at EMEC, PacWave South Test Site
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Changes in sediment dynamics

Reduced visibility impacting prey detection and obstruction avoidance.

Fish
Design feature

Minimize the amount of structure on the seabed.

Minimizes the changes in sediment dynamics due to presence of structure on the seabed.

Can present financial, logistical, or design challenges to technology developer to alter design of device/moorings.

OpenHydro and SSE Renewables 2013, Fox 2019
Wave, Tidal Operation & Maintenance EMF

Impacts of electromagnetic fields from landfall cables on sensitive species.

Fish
Demersal fish
Design feature

Strategic use of rock placement/other cable protection.

None identified

None identified

Foubister 2005, Orbital Marine Power 2010, MeyGen 2012, ScottishPower Renewables 2010, DP Energy Ltd. 2013, Federal Energy Regulatory Commission (FERC) 2020, EMEC Fall of Warness Grid-Connected Tidal Test Site, Orbital Marine Power SR250 at EMEC, MeyGen Tidal Energy Project, Sound of Islay Demonstration Tidal Array, West Islay Tidal Project Energy Park, PacWave South Test Site
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Marine Non-Native Species (MNNS)

Potential for introduction of MNNS which can have an adverse impact on the native species at the site.

Fish
Mitigation

Source vessels locally.

Reduce/remove risk of transfer and settlement of non-native species.

None identified

McPherson 2015, Nova Innovation - Shetland Tidal Array, Mocean Wave Energy Converter: Blue Horizon
Wave Operation & Maintenance Dissipation of wave energy

The potential wider or secondary effects (siltation changes or smothering) on protected or sensitive littoral habitat due to devices and associated moorings, support structures or landfall cables.

Habitat
Benthic invertebrates
None identified

Benthic and intertidal surveys focused on indicator species, species assemblage, community structure and ecosystem function.

None identified

None identified

European Marine Energy Centre (EMEC) 2019, European Marine Energy Centre (EMEC) 2011, The Marine Institute 2016, ScottishPower Renewables 2012, Xodus Group 2012, EMEC Billia Croo Grid-Connected Wave Test Site, EMEC Shapinsay Sound Scale Tidal Test Site, Galway Bay Test Site, Pelamis Wave Power P2 Demonstration at EMEC
Tidal Operation & Maintenance Changes in water flow

The potential wider or secondary effects on protected or sensitive sub-littoral seabed due to removal or alteration of energy flow arising from devices and moorings or support structures.

Marine Mammals
Monitoring

Modelling to predict the interaction between changes in tidal flow, flux and turbulence structure and animals.

Reduces scientific uncertainty so appropriate management measures can be employed

Limited management measures available to minimize interaction despite modelling to fully predict interaction.

Wave, Tidal Operation & Maintenance Entanglement

Potential for marine animals to become entangled in device mooring lines and cables.

Marine Mammals
Cetaceans
Design feature, Monitoring

Install tension sensors on mooring lines.

Informs of problem with mooring lines allowing rectification.

Additional cost and control system integration requirement.

Load from entangled animal is likely to be smaller than the device loading on the moorings.

Uncertainty of the efficacy of this measure.

Laminaria 2018, EMEC Billia Croo Grid-Connected Wave Test Site
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Barrier to movement

Potential barrier to movement due to the physical presence of devices and associated moorings/support structures, cables and electrical equipment.

Reptiles
Mitigation

Adherence to vessel management plan.

Minimizes the potential interaction between animals and construction or maintenance vessels.

None identified

Xodus Group 2019, Fox 2019
Wave, Tidal Installation Barrier to movement

Potential barrier to movement due to the physical presence of devices and associated moorings/support structures, cables and electrical equipment.

Benthic
Design feature

Array/mooring configuration designed to avoid migratory routes or other important sites.

Minimizes risk of development acting as a barrier to movement by avoiding migratory routes or other important sites.

May be inconsistent with optimal layout of the development for exploitation of the energy source.

Can be a costly measure when scaling up to larger arrays.

Aquamarine Power Ltd 2011, Davison and Mallows 2005, Fox 2019, Oyster 800 at EMEC, Strangford Lough - MCT (SeaGen)
Wave, Tidal Installation EMF

Impacts of electromagnetic fields from landfall cables on sensitive species.

Benthic
Benthic invertebrates
Design feature

Micrositing of offshore infrastructure to avoid sensitive habitats and minimize footprint.

Could reduce/remove effects on sensitive habitats.

Can often be done with little additional cost

None identified

ScottishPower Renewables 2012, Laminaria 2018, The Marine Institute 2016, EMEC Billia Croo Grid-Connected Wave Test Site, Galway Bay Test Site
Tidal Operation & Maintenance Changes in water flow

The potential wider or secondary effects on protected or sensitive sub-littoral seabed due to removal or alteration of energy flow arising from devices and moorings or support structures.

Birds
Monitoring

Modelling to predict the interaction between changes in tidal flow, flux, and turbulence structure and animals.

Reduces scientific uncertainty so appropriate management measures can be employed.

Limited management measures available to minimize interaction despite modelling to fully predict interaction.

Wave, Tidal Operation & Maintenance Lighting

Potential for lighting to adversely affect nocturnal and migratory species.

Birds
Seabirds
Design feature

Consider type, color, and use of lighting during design and consultation with navigational stakeholders.

A targeted lighting plan may have the potential to reduce impacts on sensitive species but navigational interests need to be considered at all times

Navigational safety are a consideration and may take priority over implementation of ecological aspects.

Royal Haskoning and Sea Generation (Kyle Rhea) Ltd. 2013, Kyle Rhea Tidal Stream Array Project, Perpetuus Tidal Energy Centre (PTEC)
Tidal Operation & Maintenance Collision risk

Potential for collision with turbine blades.

Fish
Monitoring

Environmental monitoring to detect collision events.

Understand avoidance behaviour, nature of interactions, and outcome of collision events.

Can be a high cost associated with this.

Unclear how much monitoring will be required to fully understand this risk.

Technology is not advanced enough yet to do this efficiently.

Data mortgage (data gathered more quickly than it can be analysed).

...Read more

Can be a high cost associated with this.

Unclear how much monitoring will be required to fully understand this risk.

Technology is not advanced enough yet to do this efficiently.

Data mortgage (data gathered more quickly than it can be analysed).

Power supply availability - hard-wired vs. battery; power is required for monitoring and power availability can present logistical, financial and technical challenges.

Interaction between equipment - e.g., multibeam sonar/ ADCP/echosounder; there can be interaction between monitoring equipment which can present challenges in monitoring.

Certain equipment used such as PAM may actually effect behaviour themselves.

Read less
SAE Renewables 2011, GlaxoSmithKlineMontrose 2012, Orbital Marine Power 2014, Atlantis Resources Corporation at EMEC, GSK Montrose Tidal Array
Wave, Tidal Operation & Maintenance EMF

Impacts of electromagnetic fields from landfall cables on sensitive species.

Fish
Demersal fish
Design feature

Limit cable voltage.

None identified

None identified

MeyGen 2012, MeyGen Tidal Energy Project
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Barrier to movement

Potential barrier to movement due to the physical presence of devices and associated moorings/support structures, cables and electrical equipment.

Habitat
Mitigation

Adherence to vessel management plan.

Minimizes the potential interaction between animals and construction or maintenance vessels.

None identified

OpenHydro and SSE Renewables 2013, Aquatera 2017, ScottishPower Renewables 2010, Xodus Group 2019, Fox 2019, Tocardo InToTidal at EMEC, Sound of Islay Demonstration Tidal Array
Wave, Tidal Installation, Decommissioning Habitat Loss

Direct loss of protected or sensitive sub-littoral seabed communities due to the presence of devices and associated moorings or support structures on the seabed.

Habitat
Benthic invertebrates, demersal fish
Design feature

Micrositing of offshore infrastructure to avoid sensitive habitats and minimize footprint.

Could reduce/remove effects on sensitive habitats.

Low cost measure at single device or small-scale array.

None identified

MeyGen 2012, ScottishPower Renewables 2012, ScottishPower Renewables 2010, Davison and Mallows 2005, SSE Renewables 2011, Laminaria 2018, Tidal Lagoon Power 2017, Sustainable Energy Authority of Ireland (SEAI) 2011, Fox 2019, MeyGen Tidal Energy Project, Ness of Duncansby Tidal Array, Sound of Islay Demonstration Tidal Array, Strangford Lough - MCT (SeaGen), Westray South Tidal Project, EMEC Billia Croo Grid-Connected Wave Test Site, Swansea Bay Tidal Lagoon (SBTL), Atlantic Marine Energy Test Site (AMETS)
Tidal Operation & Maintenance Collision risk

Potential for collision with turbine blades.

Marine Mammals
Monitoring

Environmental monitoring to better understand near-field behaviour and avoidance.

Reduce scientific uncertainty.

Can be a high cost associated with this.

Unclear how much monitoring will be required to fully understand this risk.

Technology is not advanced enough yet to do this efficiently.

Data mortgage (data gathered more quickly than it can be analysed).

...Read more

Can be a high cost associated with this.

Unclear how much monitoring will be required to fully understand this risk.

Technology is not advanced enough yet to do this efficiently.

Data mortgage (data gathered more quickly than it can be analysed).

Power supply availability - hard-wired vs. battery; power is required for monitoring and power availability can present logistical, financial, and technical challenges.

Interaction between equipment - e.g., multibeam sonar/ADCP/echosounder; there can be interaction between monitoring equipment which can present challenges in monitoring.

Certain equipment used such as PAM may actually effect behaviour themselves.

Read less
GlaxoSmithKlineMontrose 2012, Minesto 2016, Davison and Mallows 2005, Xodus Group 2019, McGrath 2013, MeyGen 2012, Orbital Marine Power 2018, AECOM 2009, GSK Montrose Tidal Array, Minesto Holyhead Deep - Non-grid connected DG500, Strangford Lough - MCT (SeaGen), EMEC Billia Croo Grid-Connected Wave Test Site, Fair Head Tidal Array, MeyGen Tidal Energy Project, Orbital Marine Power O2 at EMEC, Fundy Ocean Research Center for Energy (FORCE) Test Site
Wave, Tidal Operation & Maintenance Lighting

Potential for light from installation vessels to adversely affect nocturnal and migratory species.

Marine Mammals
Monitoring

Monitoring effects on animals.

Reduce scientific uncertainty.

Can be difficult to detect change as a result of interaction as opposed to natural variability.

Wave, Tidal Installation, Operation & Maintenance, Decommissioning Contamination

Potential for accidental or unplanned events which could lead to contamination of the marine environment.

Reptiles
Mitigation, Compliance

Management: Establish and implement a Contamination Control Plan/Ship Oil Contamination Emergency Plans (SOPEPs).

Compliance with International Maritime Organization (IMO) and Maritime Coastguard Agency (MCA) codes for the prevention of contamination.

Reduces risk of any contamination/pollution event and ensures that contingency plans are in place.

Demonstrates compliance with environmental management systems.

None identified

Foubister 2005, MeyGen 2012, Xodus AURORA 2010, Foubister 2005, Davison and Mallows 2005, Royal Haskoning and Sea Generation (Kyle Rhea) Ltd. 2013, The Marine Institute 2016, Federal Energy Regulatory Commission (FERC) 2020, EMEC Fall of Warness Grid-Connected Tidal Test Site, MeyGen Tidal Energy Project, HS1000 at EMEC, Strangford Lough - MCT (SeaGen), Kyle Rhea Tidal Stream Array Project, Galway Bay Test Site, PacWave South Test Site
Tidal Operation & Maintenance Changes in water flow

The potential wider or secondary effects on protected or sensitive sub-littoral seabed due to removal or alteration of energy flow arising from devices and moorings or support structures.

Benthic
Monitoring

Modelling to predict the interaction between changes in tidal flow, flux and turbulence structure and animals.

Reduces scientific uncertainty so appropriate management measures can be employed.

Limited management measures available to minimize interaction despite modelling to fully predict interaction

Wave, Tidal Installation, Decommissioning Habitat Loss

Direct loss of protected or sensitive sub-littoral seabed communities due to the presence of devices and associated moorings or support structures on the seabed.

Benthic
Benthic invertebrates, demersal fish
Mitigation

Use of locally sourced materials, for cable protection, of the same type as the habitat to be disturbed by cable installation.

Minimize impact on biodiversity/ecosystem - lost seabed is replaced with same material and minimizes habitat loss.

None identified

Tidal Lagoon Power 2017, Swansea Bay Tidal Lagoon (SBTL)
Tidal Operation & Maintenance Collision risk

Potential for collision with turbine blades.

Birds
Diving birds
Mitigation

Reduce maximum blade tip speed.

Could reduce the likelihood or consequence of potential collision events.

Potential impacts on power production.

Control mechanism of turbine blade speed unclear.

May cause increased fatigue.

Wave, Tidal Installation, Operation & Maintenance, Decommissioning Vessel disturbance

Potential for disturbance from project vessels.

Birds
Birds on water
Mitigation

Adhere to minimum approach distances for vessels on approach.

Reduces potential effects.

Relatively low-cost measure.

Effectiveness of mitigation is unclear. Further monitoring (e.g., defining of approach distances and then comparing these to see which are most effective) would validate the efficacy of the measure.

Can increase the time of operational procedures and thus increase cost.

Xodus Group 2019, European Marine Energy Centre (EMEC) 2020, DP Energy Ltd. 2017, Aquatera 2017, Federal Energy Regulatory Commission (FERC) 2020, EMEC Billia Croo Grid-Connected Wave Test Site, EMEC Scapa Flow Scale Wave Test Site, Fair Head Tidal Array, Tocardo InToTidal at EMEC, PacWave South Test Site
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Contamination

Potential for accidental or unplanned events which could lead to contamination of the marine environment.

Fish
Compliance

Management: Establish and implement a Contamination Control Plan/Ship Oil Contamination Emergency Plans (SOPEPs).

Compliance with International Maritime Organization (IMO) and Maritime Coastguard Agency (MCA) codes for the prevention of contamination.

Reduces risk of any contamination/pollution event and ensures that contingency plans are in place.

Demonstrates compliance with environmental management systems.

None identified

Foubister 2005, GlaxoSmithKlineMontrose 2012, MeyGen 2012, DP Energy Ltd. 2013, Davison and Mallows 2005, Royal Haskoning and Sea Generation (Kyle Rhea) Ltd. 2013, The Marine Institute 2016, Federal Energy Regulatory Commission (FERC) 2020, EMEC Fall of Warness Grid-Connected Tidal Test Site, GSK Montrose Tidal Array, MeyGen Tidal Energy Project, West Islay Tidal Project Energy Park, Strangford Lough - MCT (SeaGen), Kyle Rhea Tidal Stream Array Project, Galway Bay Test Site, PacWave South Test Site
Wave, Tidal Operation & Maintenance Habitat Creation

The introduction of infrastructure and artificial substrates will provide habitat and artificial refuges.

Fish
Monitoring

Monitor near-field behaviors.

Reduces scientific uncertainty around collision risk, displacement, and other impacts.

Increased value/fecundity of commercially important species.

...Read more

Reduces scientific uncertainty around collision risk, displacement, and other impacts.

Increased value/fecundity of commercially important species.

Informs understanding of potential positive impacts from colonization and use of the project infrastructure (this could benefit future project application)

Read less

Can be expensive and difficult to deliver in practice.

May require additional licensing (e.g., echosounders).

European Marine Energy Centre (EMEC) 2014, Xodus Group 2019, Magallanes Renovables 2020, Laminaria 2018, EMEC Fall of Warness Grid-Connected Tidal Test Site, EMEC Billia Croo Grid-Connected Wave Test Site, Magallanes Renovables ATIR at EMEC, EMEC Billia Croo Grid-Connected Wave Test Site
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Contamination

Potential for accidental or unplanned events which could lead to contamination of the marine environment.

Habitat
Design feature

Physical containment systems including bulk heads, closed circuit systems, pressure relief systems.

Reduces risk of contamination/pollution escaping from structure.

None identified

Foubister 2005, MeyGen 2012, South West of England Regional Development Agency (SWDRA) 2006, Magallanes Renovables 2020, Sustainable Energy Authority of Ireland (SEAI) 2011, The Marine Institute 2016, EMEC Fall of Warness Grid-Connected Tidal Test Site, MeyGen Tidal Energy Project, Magallanes Renovables ATIR at EMEC, Galway Bay Test Site
Wave, Tidal Installation Barrier to movement

Potential barrier to movement due to the physical presence of devices and associated moorings/support structures, cables and electrical equipment.

Marine Mammals
Design feature

Site selection to avoid sensitive routes/areas.

Minimizes risk of development acting as a barrier to movement by avoiding migratory routes or other important sites.

None identified

ScottishPower Renewables 2012, Fox 2019, Ness of Duncansby Tidal Array
Wave, Tidal Operation & Maintenance Contamination

Potential for oil/hydraulic spill incident resulting from the maintenance activities.

Marine Mammals
Mitigation

All maintenance activities involving oil/hydraulic fluid treatments will be carried out on-shore.

Reduces the chance for oil spill to the environment.

None identified

Foubister 2005, EMEC Fall of Warness Grid-Connected Tidal Test Site
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Vessel disturbance

Potential for disturbance from project vessels.

Marine Mammals
Mitigation

Reduce speed and maintain steady course when animal is sighted.

Reduces potential effects and is a relatively low cost measure.

None identified

Aquamarine Power Ltd 2011, Xodus AURORA 2010, Aquatera Ltd 2011, European Marine Energy Centre (EMEC) 2020, Magallanes Renovables 2020, Royal Haskoning 2012, Aquatera 2017, Tidal Lagoon Power 2017, Federal Energy Regulatory Commission (FERC) 2020, Orbital Marine Power 2018, Oyster 800 at EMEC, HS1000 at EMEC, Wello Penguin at EMEC, EMEC Scapa Flow Scale Wave Test Site, Magallanes Renovables ATIR at EMEC, Oyster 800 at EMEC, Tocardo InToTidal at EMEC, Swansea Bay Tidal Lagoon (SBTL), PacWave South Test Site, Orbital Marine Power O2 at EMEC
Wave, Tidal Operation & Maintenance Entrapment

Potential risk of entrapment within device chambers and mooring arrays.

Reptiles
Mitigation

Regular ROV/drop down camera surveys to establish occurrence of entrapment

Early detection of entrapment.

Additional cost.

Wave Operation & Maintenance Dissipation of wave energy

The potential wider or secondary effects on protected or sensitive sub-littoral seabed due to removal or alteration of energy flow arising from devices and moorings or support structures.

Benthic
Benthic invertebrates
Monitoring

Benthic and intertidal surveys focused on indicator species, species assemblage, community structure and ecosystem function.

Reduce scientific uncertainty.

Determining impacts against natural variability may be difficult.

European Marine Energy Centre (EMEC) 2019, European Marine Energy Centre (EMEC) 2011, Xodus Group 2012, McGrath 2013, The Marine Institute 2016, EMEC Billia Croo Grid-Connected Wave Test Site, EMEC Shapinsay Sound Scale Tidal Test Site, Costa Head Wave Farm, Fair Head Tidal Array, Galway Bay Test Site
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Airborne noise

The potential effects from airborne noise from support vessel activity.

Birds
Seabirds
Mitigation

Adherence to Scottish Marine Wildlife Watching Code (SMWWC).

None identified

None identified

Magallanes Renovables 2020, Xodus Group 2019, European Marine Energy Centre (EMEC) 2020, Aquatera 2017, Laminaria 2018, Orbital Marine Power 2018, Magallanes Renovables ATIR at EMEC, EMEC Billia Croo Grid-Connected Wave Test Site, EMEC Scapa Flow Scale Wave Test Site, Tocardo InToTidal at EMEC, EMEC Billia Croo Grid-Connected Wave Test Site, Orbital Marine Power O2 at EMEC, Mocean Wave Energy Converter: Blue Horizon
Wave, Tidal Operation & Maintenance Entanglement

Potential for marine animals to become entangled in device mooring lines and cables.

Birds
Diving birds
Design feature

Fishing debris detected during routine inspections of mooring lines and cables will be removed.

Remove/reduce risk of entanglement.

Low cost measure, implemented as part of standard O&M procedures.

Regular monitoring will benefit system performance in addition to addressing environmental risks (e.g., early detection of damage or failures in the system).

None identified

Wave, Tidal Installation, Operation & Maintenance, Decommissioning Changes in sediment dynamics

Sediment disturbance disrupting water clarity that results in smothering of fish spawning grounds.

Fish
Design feature

Minimize the amount of structure on the seabed.

Minimizes the changes in sediment dynamics due to presence of structure on the seabed.

Can present financial, logistical, or design challenges to technology developer to alter design of device/moorings.

OpenHydro and SSE Renewables 2013, Fox 2019
Wave, Tidal Operation & Maintenance EMF

Impacts of electromagnetic fields from landfall cables on sensitive species.

Fish
Demersal fish
Design feature

Bundle cables together to reduce field vectors.

None identified

None identified

MeyGen 2012, MeyGen Tidal Energy Project
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Marine Non-Native Species (MNNS)

Potential for introduction of MNNS which can have an adverse impact on the native species at the site.

Fish
Monitoring

Monitoring and reporting of MNNS.

Reduces/removes risk of transfer of non-native species.

None identified

PLAT-O at EMEC
Wave Operation & Maintenance Dissipation of wave energy

The potential wider or secondary effects on protected or sensitive sub-littoral seabed due to removal or alteration of energy flow arising from devices and moorings or support structures.

Habitat
Benthic invertebrates
Monitoring

Benthic and intertidal surveys focused on indicator species, species assemblage, community structure and ecosystem function.

Reduce scientific uncertainty.

Determining impacts against natural variability may be difficult.

European Marine Energy Centre (EMEC) 2019, European Marine Energy Centre (EMEC) 2011, The Marine Institute 2016, ScottishPower Renewables 2012, Xodus Group 2012, Fox 2019, EMEC Billia Croo Grid-Connected Wave Test Site, EMEC Shapinsay Sound Scale Tidal Test Site, Galway Bay Test Site, Pelamis Wave Power P2 Demonstration at EMEC
Tidal Operation & Maintenance Changes in water flow

Modifications to prey distribution and abundance (to include for other receptors) resulting in changes to foraging behaviour.

Marine Mammals
Monitoring

Modelling to predict the interaction between changes in tidal flow, flux and turbulence structure and animals.

Reduces scientific uncertainty so appropriate management measures can be employed

Limited management measures available to minimize interaction despite modelling to fully predict interaction.

Wave, Tidal Operation & Maintenance Entanglement

Potential for marine animals to become entangled in device mooring lines and cables.

Marine Mammals
Cetaceans
Monitoring

Fishing debris detected during routine inspections of mooring lines and cables will be removed.

Remove/reduce risk of entanglement

Low cost measure, implemented as part of standard O&M procedures.

Regular monitoring will benefit system performance in addition to addressing environmental risks (e.g., early detection of damage or failures in the system).

None identified

Wave, Tidal Installation, Operation & Maintenance, Decommissioning Barrier to movement

Potential barrier to movement due to the physical presence of devices and associated moorings/support structures, cables and electrical equipment.

Reptiles
Monitoring

Monitoring of existing developments.

Reduces scientific uncertainty.

Can be complex and costly.

Wave, Tidal Installation, Operation & Maintenance, Decommissioning Barrier to movement

Potential barrier to movement due to the physical presence of devices and associated moorings/support structures, cables and electrical equipment.

Benthic
Mitigation

Adherence to vessel management plan.

Minimizes the potential interaction between animals and construction or maintenance vessels.

None identified

OpenHydro and SSE Renewables 2013, Aquatera 2017, ScottishPower Renewables 2010, Xodus Group 2019, Fox 2019, Tocardo InToTidal at EMEC, Sound of Islay Demonstration Tidal Array
Wave, Tidal Operation & Maintenance EMF

Impacts of electromagnetic fields from landfall cables on sensitive species.

Benthic
Benthic invertebrates
Design feature

Maximize length of any drilled boreholes.

None identified

None identified

MeyGen 2012, MeyGen Tidal Energy Project
Tidal Operation & Maintenance Changes in water flow

The potential wider or secondary effects on protected or sensitive sub-littoral seabed due to removal or alteration of energy flow arising from devices and moorings or support structures.

Birds
Design feature

Site selection.

Minimizes significance of interaction.

None identified

ScottishPower Renewables 2012, Fox 2019, Ness of Duncansby Tidal Array
Wave, Tidal Installation Lighting

Potential for light from installation vessels to adversely affect nocturnal and migratory species.

Birds
Seabirds
Mitigation

Limit lighting on installation vessels to that safe for navigational purposes only.

Reduce impact on sensitive species.

A lot of the light on navigational vessels is superfluous so would not detract from their safe operation.

None identified

Xodus Group 2019, AECOM 2009, EMEC Billia Croo Grid-Connected Wave Test Site, Fundy Ocean Research Center for Energy (FORCE) Test Site
Tidal Operation & Maintenance Collision risk

Potential for collision with turbine blades.

Fish
Elasmobranch
Mitigation

Implement a 'soft start'/cut in speed management approach at sensitive sites, i.e. those where the potential for collisions is high.

Soft start could reduce risk by allowing animals time to move away from the turbine.

Cut in speed management could be used to reduce risk during periods of known higher activity in sensitive species.

Low cost option, adopted for other activities (e.g., piling).

Unclear if this offers additional mitigation as many devices power up gradually anyway.

Implementation of this measure could result in a loss of revenue for the developer.

MeyGen 2012, European Marine Energy Centre (EMEC) 2014, SAE Renewables 2011, Tidal Lagoon Power 2017, MeyGen Tidal Energy Project, EMEC Fall of Warness Grid-Connected Tidal Test Site, Atlantis Resources Corporation at EMEC, Swansea Bay Tidal Lagoon (SBTL)
Wave, Tidal Operation & Maintenance Entanglement

Potential for marine animals to become entangled in device mooring lines and cables.

Fish
Elasmobranch, large fish
Design feature

Maintain taut mooring lines.

Remove/reduce risk of entanglement.

Regular inspections can provide insight to interaction with marine animals.

Mooring design driven by technical and commercial consideration.

Regular ROV/dive or drop-down camera inspections required.

Aquatera Ltd 2011, Laminaria 2018, Federal Energy Regulatory Commission (FERC) 2020, Wello Penguin at EMEC, EMEC Billia Croo Grid-Connected Wave Test Site, PacWave South Test Site
Wave, Tidal Installation, Decommissioning Changes in sediment dynamics

Reduced visibility impacting prey detection and obstruction avoidance.

Habitat
Mitigation

Best practice methodologies to reduce resuspension of sediment during cable burial or device foundation/mooring installation.

None identified

None identified

Orbital Marine Power 2014, Foubister 2005, ScottishPower Renewables 2010, Royal Haskoning and Sea Generation (Kyle Rhea) Ltd. 2013, Sustainable Energy Authority of Ireland (SEAI) 2011, The Marine Institute 2016, EMEC Fall of Warness Grid-Connected Tidal Test Site, Sound of Islay Demonstration Tidal Array, Kyle Rhea Tidal Stream Array Project, Atlantic Marine Energy Test Site (AMETS), Galway Bay Test Site
Wave, Tidal Installation, Decommissioning Habitat Loss

Direct loss of protected or sensitive sub-littoral seabed communities due to the presence of devices and associated moorings or support structures on the seabed.

Habitat
Benthic invertebrates, demersal fish
Design feature

Minimize footprint of anchors/foundations.

Could reduce effects on sensitive habitats.

May impact technical considerations.

Low 2012, OpenHydro and SSE Renewables 2013, SSE Renewables 2011, Fox 2019, Westray South Tidal Project
Tidal Operation & Maintenance Collision risk

Potential for collision with turbine blades.

Marine Mammals
Mitigation

Selective structural and blade coatings (e.g., colors to aide detection).

Possible that this will aid detection of subsea structures and help reduce risk.

Can be captured in early project design for a small one-off cost.

Could result in 'attraction', increasing risk of collision.

Uncertainty around how animals use visual cues, further research needed. Other sensory organs are often more important for seals.

Use of such measures may be limited to conform with IALA standards.

Xodus Group 2019, EMEC Billia Croo Grid-Connected Wave Test Site
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Marine Non-Native Species (MNNS)

Potential for introduction of MNNS which can have an adverse impact on the native species at the site.

Marine Mammals
Mitigation

Establish and implement a Biofouling Management Plan.

Reduce/remove risk of transfer of non-native species.

Lack of industry specific guidance.

European Marine Energy Centre (EMEC) 2014, EMEC Fall of Warness Grid-Connected Tidal Test Site
Wave, Tidal Operation & Maintenance Displacement

Potential displacement of essential activities due to the presence of devices and associated moorings/support structures.

Reptiles
Design feature

Site selection (taking into account cumulative impact of other developments).

Minimizes risk of development causing displacement by avoiding migratory routes or other important sites.

None identified

Tidal Operation & Maintenance Changes in water flow

The potential wider or secondary effects on protected or sensitive sub-littoral seabed due to removal or alteration of energy flow arising from devices and moorings or support structures.

Benthic
Design feature

Site selection.

Minimizes significance of interaction.

ScottishPower Renewables 2012, Fox 2019, Ness of Duncansby Tidal Array
Wave, Tidal Installation, Decommissioning Habitat Loss

Direct loss of protected or sensitive sub-littoral seabed communities due to the presence of devices and associated moorings or support structures on the seabed.

Benthic
Benthic invertebrates, demersal fish
Design feature

Site selection to avoid sensitive or protected sub-littoral seabed communities.

This could reduce/remove effects on sensitive habitats.

None identified

Orbital Marine Power 2014, ScottishPower Renewables 2012, Fox 2019, Ness of Duncansby Tidal Array, Perpetuus Tidal Energy Centre (PTEC)
Tidal Operation & Maintenance Collision risk

Potential for collision with turbine blades.

Birds
Diving birds
Mitigation

Design proportion of swept area to structure area to minimize collision risk.

This could reduce the likelihood/consequence of potential collision events.

Can be a high cost associated with this.

Can present financial/ logistical/ design challenges to technology developer to alter design of device.

MeyGen 2012, Fox 2019, MeyGen Tidal Energy Project
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Vessel disturbance

Potential for disturbance from project vessels.

Birds
Shore-nesting birds
Mitigation

Avoidance of sensitive shore nesting areas during sensitive periods with appropriate clearance distance.

Reduces potential effects.

Relatively low-cost measure.

None identified

OpenHydro and SSE Renewables 2013, Orbital Marine Power 2014, Foubister 2005, Xodus Group 2019, Magallanes Renovables 2020, Royal Haskoning and Sea Generation (Kyle Rhea) Ltd. 2013, ScottishPower Renewables 2012, Orbital Marine Power 2014, Aquatera 2017, The Marine Institute 2016, THETIS Energy 2009, Orbital Marine Power 2018, EMEC Fall of Warness Grid-Connected Tidal Test Site, EMEC Billia Croo Grid-Connected Wave Test Site, Magallanes Renovables ATIR at EMEC, Kyle Rhea Tidal Stream Array Project, Tocardo InToTidal at EMEC, Galway Bay Test Site, Torr Head Project, Orbital Marine Power O2 at EMEC
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Contamination

Potential for oil spill incident resulting from the influence of unfavorable weather conditions.

Fish
Mitigation

Vessel activities to occur in suitable weather conditions.

Reduces the chance for oil spill to the environment.

None identified

MeyGen 2012, The Marine Institute 2016, ScottishPower Renewables 2012, MeyGen Tidal Energy Project, Galway Bay Test Site, Pelamis Wave Power P2 Demonstration at EMEC
Wave, Tidal Installation, Decommissioning Habitat Loss

Direct loss of protected or sensitive sub-littoral seabed communities due to the presence of devices and associated moorings or support structures on the seabed.

Fish
Demersal fish
Design feature

Micro siting of offshore infrastructure to avoid sensitive habitats and minimize footprint.

Could reduce/remove effects on sensitive habitats.

Low cost measure at single device or small-scale array.

None identified

Foubister 2005, Royal Haskoning and Sea Generation (Kyle Rhea) Ltd. 2013, ScottishPower Renewables 2012, Laminaria 2018, The Marine Institute 2016, EMEC Fall of Warness Grid-Connected Tidal Test Site, Kyle Rhea Tidal Stream Array Project, EMEC Billia Croo Grid-Connected Wave Test Site, Galway Bay Test Site
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Contamination

Potential for accidental or unplanned events which could lead to contamination of the marine environment.

Habitat
Mitigation

Material selection - lubricants, coolants, hydraulic fluids etc. selected with low ecotoxicity levels and biodegradable.

Reduces/removes risk of contamination/pollution from materials which may have escaped structure.

Use of lower toxicity materials may compromise performance or impact other technical issues (e.g., fluid changes.)

Foubister 2005, MeyGen 2012, Xodus AURORA 2010, The Marine Institute 2016, THETIS Energy 2009, EMEC Fall of Warness Grid-Connected Tidal Test Site, MeyGen Tidal Energy Project, HS1000 at EMEC, Galway Bay Test Site, Torr Head Project
Wave, Tidal Installation Barrier to movement

Potential barrier to movement due to the physical presence of devices and associated moorings/support structures, cables and electrical equipment.

Marine Mammals
Design feature

Array/mooring configuration designed to avoid migratory routes or other important sites

Minimizes risk of development acting as a barrier to movement by avoiding migratory routes or other important sites

May be inconsistent with optimal layout of the development for exploitation of the energy source.

Can be a costly measure when scaling up to larger arrays.

Aquamarine Power Ltd 2011, Davison and Mallows 2005, Fox 2019, Oyster 800 at EMEC, Strangford Lough - MCT (SeaGen)
Wave, Tidal Installation Contamination

Accidental release of contaminants during installation including diesel fuel, oil hydraulic fluids, etc.

Habitat
Mitigation

Best practice methodologies to reduce risk of accidental release of contaminants.

Reduces risk of contamination/pollution escaping from structure.

None identified

DP Energy Ltd. 2013, Naval Facilities Engineering Command (NAVFAC) 2014, West Islay Tidal Project Energy Park, U.S. Navy Wave Energy Test Site (WETS)
Wave, Tidal Operation & Maintenance Vessel disturbance

Potential for disturbance from project vessels.

Marine Mammals
Mitigation

Use smaller vessels for maintenance purposes.

Reduces potential effects and is a relatively low cost measure.

None identified

Aquatera Ltd 2011, Laminaria 2018, Naval Facilities Engineering Command (NAVFAC) 2014, Wello Penguin at EMEC, EMEC Billia Croo Grid-Connected Wave Test Site, U.S. Navy Wave Energy Test Site (WETS)
Wave, Tidal Operation & Maintenance Habitat Creation

The introduction of infrastructure and artificial substrates will provide habitat and artificial refuges.

Reptiles
Monitoring

Monitor near-field behaviors.

Informs understanding of potential positive impacts from colonization and use of the project infrastructure.

Reduces scientific uncertainty around collision risk, displacement, and other impacts.

Increased value/fecundity of commercially important species.

Can be expensive and difficult to deliver in practice.

May require additional licensing (e.g., echosounders).

Wave Operation & Maintenance Dissipation of wave energy

The potential wider or secondary effects on protected or sensitive sub-littoral seabed due to removal or alteration of energy flow arising from devices and moorings or support structures.

Benthic
Benthic invertebrates
Monitoring

Modelling to predict the interaction between wave energy and animals.

Reduces scientific uncertainty so appropriate management measures can be employed.

Limited management measures available to minimize interaction despite modelling to fully predict interaction.

Wave, Tidal Installation Barrier to movement

Potential barrier to movement due to the physical presence of devices and associated moorings/support structures, cables and electrical equipment.

Birds
Monitoring

Array installation carried out in phases.

Allows close monitoring to observe any unexpected effects.

Reduces scientific uncertainty.

Can be complex and costly

GlaxoSmithKlineMontrose 2012, GSK Montrose Tidal Array
Wave, Tidal Operation & Maintenance Entanglement

Potential for marine animals to become entangled in lost fishing gear or other equipment trapped on infrastructure.

Birds
Diving birds
Compliance

Ensure standard notifications of loss of fishing gear in region notified to operators. Reporting of entanglement events.

Good practice for emergency preparedness.

Help track effects/interaction with marine animals.

Chances of lost fishing gear being reported is reportedly low.

Wave, Tidal Installation, Operation & Maintenance, Decommissioning Changes in sediment dynamics

Reduced visibility impacting prey detection and obstruction avoidance.

Fish
Monitoring

Modelling to predict the interaction between changes in sediment dynamics and animals.

Reduces scientific uncertainty so appropriate management measures can be employed.

Limited management measures available to minimize interaction despite modelling to fully predict interaction.

MeyGen 2012, Fox 2019, MeyGen Tidal Energy Project
Wave, Tidal Operation & Maintenance EMF

Impacts of electromagnetic fields from landfall cables on sensitive species.

Fish
Demersal fish
Design feature

Bury cables where possible and viable.

None identified

None identified

Sustainable Energy Authority of Ireland (SEAI) 2011, Tidal Lagoon Power 2017, Federal Energy Regulatory Commission (FERC) 2020, Atlantic Marine Energy Test Site (AMETS), Swansea Bay Tidal Lagoon (SBTL), PacWave South Test Site
Tidal Operation & Maintenance Marine Non-Native Species (MNNS)

Potential for introduction of MNNS which can have an adverse impact on the native species at the site.

Fish
Mitigation, Design feature

Antifouling application on components such as the pile and rodos blades.

Helps prevent colonization of the device and structure, avoiding forming a stepping stone for non-native species.

None identified

Royal Haskoning and Sea Generation (Kyle Rhea) Ltd. 2013, Kyle Rhea Tidal Stream Array Project
Wave, Tidal Operation & Maintenance EMF

Impacts of electromagnetic fields from subsea cables on sensitive species.

Habitat
Benthic invertebrates
Design feature

Install cable protection, armor, rock placement, or other cable protection.

Reduce the level of EMF to surrounding water column and therefore any potential effects.

Reduces 'snagging risk' for vessels.

Creation of artificial habitat leading to greater fecundity in species.

May have an impact on surrounding benthic habitats and sensitive species.

Creation of artificial habitat may cause aggregation effect causing greater impact of EMF.

Uncertainty around the need for and efficacy of this measure.

Increased cost to project.

...Read more

May have an impact on surrounding benthic habitats and sensitive species.

Creation of artificial habitat may cause aggregation effect causing greater impact of EMF.

Uncertainty around the need for and efficacy of this measure.

Increased cost to project.

Reduced possibilities for decommissioning in future.

Direct disturbance/loss of benthic communities.

Read less
Foubister 2005, Orbital Marine Power 2010, MeyGen 2012, ScottishPower Renewables 2010, DP Energy Ltd. 2013, Fox 2019, EMEC Fall of Warness Grid-Connected Tidal Test Site, Orbital Marine Power SR250 at EMEC, MeyGen Tidal Energy Project, Sound of Islay Demonstration Tidal Array, West Islay Tidal Project Energy Park
Tidal Operation & Maintenance Changes in water flow

The potential wider or secondary effects on protected or sensitive sub-littoral seabed due to removal or alteration of energy flow arising from devices and moorings or support structures.

Marine Mammals
Design feature

Site selection.

Minimizes significance of interaction.

None identified

ScottishPower Renewables 2012, Fox 2019, Ness of Duncansby Tidal Array
Wave, Tidal Operation & Maintenance Entanglement

Potential for marine animals to become entangled in lost fishing gear or other equipment trapped on infrastructure.

Marine Mammals
Cetaceans
Monitoring

Ensure standard notifications of loss of fishing gear in region notified to operators. Reporting of entanglement events.

Good practice for emergency preparedness.

Chances of lost fishing gear being reported is reportedly low.

Federal Energy Regulatory Commission (FERC) 2020, PacWave South Test Site
Wave, Tidal Installation, Decommissioning Changes in sediment dynamics

Reduced visibility impacting prey detection and obstruction avoidance.

Reptiles
Mitigation

Best practice methodologies to reduce resuspension of sediment during cable burial or device foundation/mooring installation.

None identified

None identified

Wave, Tidal Operation & Maintenance Changes in sediment dynamics

The potential wider or secondary effects (siltation changes or smothering) on protected or sensitive sub-littoral seabed due to scour or siltation around devices and associated moorings, support structures and export cables.

Benthic
Benthic invertebrates, demersal fish
Monitoring

Periodic visual monitoring through the use of divers or drop down video, static cameras / remote sensing techniques, benthic grab surveys, geophysical survey to identify scour pits, turbidity measurements.

Generation of data to quantify level and spatial extent of effect.

Technical and health and safety risks associated with periodic monitoring operation in close vicinity of infrastructure.

May require power shut down measure.

Subsea static monitoring options require O&M which may have time and cost implications.

Tidal Energy Ltd 2008, OpenHydro and SSE Renewables 2013, Foubister 2005, European Marine Energy Centre (EMEC) 2011, ScottishPower Renewables 2010, Davison and Mallows 2005, SSE Renewables 2011, Federal Energy Regulatory Commission (FERC) 2020, Xodus Group 2012, AECOM 2009, Ramsey Sound, EMEC Fall of Warness Grid-Connected Tidal Test Site, EMEC Shapinsay Sound Scale Tidal Test Site, Sound of Islay Demonstration Tidal Array, Strangford Lough - MCT (SeaGen), Westray South Tidal Project, PacWave South Test Site, Fundy Ocean Research Center for Energy (FORCE) Test Site
Wave, Tidal Operation & Maintenance EMF

Impacts of electromagnetic fields from landfall cables on sensitive species.

Benthic
Benthic invertebrates
Design feature

Strategic use of rock placement/other cable protection.

None identified

None identified

Orbital Marine Power 2010, MeyGen 2012, DP Energy Ltd. 2017, ScottishPower Renewables 2010, DP Energy Ltd. 2013, Orbital Marine Power SR250 at EMEC, Westray South Tidal Project, MeyGen Tidal Energy Project, Sound of Islay Demonstration Tidal Array, West Islay Tidal Project Energy Park
Tidal Operation & Maintenance Changes in water flow

Modifications to prey distribution and abundance (to include for other receptors) resulting in changes to foraging behavior.

Birds
Diving birds
Design feature

Design structures to minimize effect on turbulence structure.

Minimizes change in turbulence structure and hence potential interaction.

Can present financial, logistical, or design challenges to technology developer to alter design of device/moorings.

Aquamarine Power Ltd 2011, Davison and Mallows 2005, Tidal Energy Ltd 2008, Fox 2019, Oyster 800 at EMEC, Strangford Lough - MCT (SeaGen), Ramsey Sound
Wave, Tidal Operation & Maintenance Lighting

Potential for light from installation vessels to adversely affect nocturnal and migratory species.

Birds
Seabirds
Monitoring

Monitoring effects on animals.

Reduce scientific uncertainty.

Can be difficult to detect change as a result of interaction as opposed to natural variability.

Xodus Group 2019, Fox 2019, EMEC Billia Croo Grid-Connected Wave Test Site
Tidal Operation & Maintenance Collision risk

Potential for collision with turbine blades.

Fish
Monitoring

Environmental monitoring to better understand near-field behaviour and avoidance.

Could reduce potential effects on sensitive species during sensitive periods.

Help reduce scientific uncertainty.

Can be a high cost associated with this.

Unclear how much monitoring will be required to fully understand this risk.

Technology is not advanced enough yet to do this efficiently.

Data mortgage (data gathered more quickly than it can be analysed).

...Read more

Can be a high cost associated with this.

Unclear how much monitoring will be required to fully understand this risk.

Technology is not advanced enough yet to do this efficiently.

Data mortgage (data gathered more quickly than it can be analysed).

Power supply availability - hard-wired vs. battery; power is required for monitoring and power availability can present logistical, financial and technical challenges.

Interaction between equipment - e.g., multibeam sonar/ ADCP/echosounder; there can be interaction between monitoring equipment which can present challenges in monitoring.

Certain equipment used such as PAM may actually effect behaviour themselves.

Difficulties associated with storing and anlysing the data produce

Read less
Xodus Group 2019, Magallanes Renovables 2020, EMEC Billia Croo Grid-Connected Wave Test Site, Magallanes Renovables ATIR at EMEC
Wave, Tidal Operation & Maintenance Entanglement

Potential for marine animals to become entangled in device mooring lines and cables.

Fish
Elasmobranch, large fish
Design feature

Cable design with maximum bend radius.

Remove/reduce risk of entanglement

Mooring design driven by technical and commercial consideration.

Foubister 2005, EMEC Fall of Warness Grid-Connected Tidal Test Site
Wave, Tidal Installation, Decommissioning Changes in sediment dynamics

Sediment disturbance disrupting water clarity that results in smothering of fish spawning grounds.

Habitat
Mitigation

Best practice methodologies to reduce resuspension of sediment during cable burial or device foundation/mooring installation.

None identified

None identified

Orbital Marine Power 2014, ScottishPower Renewables 2010, Royal Haskoning and Sea Generation (Kyle Rhea) Ltd. 2013, Sustainable Energy Authority of Ireland (SEAI) 2011, The Marine Institute 2016, Sound of Islay Demonstration Tidal Array, Kyle Rhea Tidal Stream Array Project, Atlantic Marine Energy Test Site (AMETS), Galway Bay Test Site
Wave, Tidal Installation, Decommissioning Habitat Loss

Direct loss of protected or sensitive sub-littoral seabed communities due to the presence of devices and associated moorings or support structures on the seabed.

Habitat
Benthic invertebrates, demersal fish
Design feature

Cable protection management measures to ensure that any rock placement that is required will be kept to a minimum to reduce seabed disturbance.

Could reduce effects on sensitive habitats.

Additional cost.

AECOM 2009, Fox 2019, Fundy Ocean Research Center for Energy (FORCE) Test Site
Tidal Operation & Maintenance Collision risk

Potential for collision with turbine blades.

Marine Mammals
Diving birds
Mitigation

Reduce maximum blade tip speed.

Could reduce the likelihood/consequence of potential collision events.

Potential impacts on power production.

Control mechanism of turbine blade speed unclear.

May cause increased fatigue.

Wave, Tidal Installation, Operation & Maintenance, Decommissioning Marine Non-Native Species (MNNS)

Potential for introduction of MNNS which can have an adverse impact on the native species at the site.

Marine Mammals
Mitigation, Compliance

Adhere to appropriate measures when jettisoning ballast water.

Reduce/remove risk of transfer of non-native species.

None identified

Sustainable Energy Authority of Ireland (SEAI) 2011, Atlantic Marine Energy Test Site (AMETS)
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Displacement

Potential displacement of essential activities due to the presence of devices and associated moorings/support structures.

Reptiles
Mitigation

Timing of installation and decommissioning & marine operations to avoid times of particular sensitivity (e.g., breeding).

Minimizes risk of development causing displacement by avoiding works during sensitive times.

Can be disruptive and hence costly to developer.

Wave, Tidal Installation, Operation & Maintenance, Decommissioning Contamination

Potential for accidental or unplanned events which could lead to contamination of the marine environment.

Benthic
Design feature

Physical Containment systems including bulk heads, closed circuit systems, pressure relief systems.

Reduces risk of contamination/pollution escaping from structure.

None identified

Foubister 2005, MeyGen 2012, Royal Haskoning and Sea Generation (Kyle Rhea) Ltd. 2013, Magallanes Renovables 2020, Sustainable Energy Authority of Ireland (SEAI) 2011, Tidal Lagoon Power 2017, The Marine Institute 2016, Aquamarine Power Ltd 2011, EMEC Fall of Warness Grid-Connected Tidal Test Site, MeyGen Tidal Energy Project, Kyle Rhea Tidal Stream Array Project, Magallanes Renovables ATIR at EMEC, Atlantic Marine Energy Test Site (AMETS), Swansea Bay Tidal Lagoon (SBTL), Galway Bay Test Site, Oyster 800 at EMEC
Wave, Tidal Installation, Decommissioning Habitat Loss

Seabed habitat disturbance/loss or changes to

seabed habitat

Benthic
Benthic invertebrates, demersal fish
Mitigation

Adherence to vessel anchor and device anchor/mooring plans.

Minimize impact on biodiversity/ecosystem.

None identified

Xodus Group 2019, Federal Energy Regulatory Commission (FERC) 2020, EMEC Billia Croo Grid-Connected Wave Test Site, PacWave South Test Site
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Contamination

Potential for accidental or unplanned events which could lead to contamination of the marine environment.

Birds
Design feature

Physical containment systems including bulk heads, closed circuit systems, pressure relief systems.

Reduces risk of contamination/pollution escaping from structure.

None identified

Foubister 2005, MeyGen 2012, Royal Haskoning and Sea Generation (Kyle Rhea) Ltd. 2013, Magallanes Renovables 2020, Sustainable Energy Authority of Ireland (SEAI) 2011, The Marine Institute 2016, THETIS Energy 2009, EMEC Fall of Warness Grid-Connected Tidal Test Site, MeyGen Tidal Energy Project, Kyle Rhea Tidal Stream Array Project, Magallanes Renovables ATIR at EMEC, Atlantic Marine Energy Test Site (AMETS), Galway Bay Test Site, Torr Head Project
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Vessel disturbance

Potential for disturbance from project vessels.

Birds
Birds on water
Mitigation

Vessel transit route: defining routes to avoid sensitive sites and to only disturb one route.

Reduces potential effects.

Relatively low-cost measure.

This is measurable and definable.

None identified

OpenHydro and SSE Renewables 2013, DP Energy Ltd. 2013, European Marine Energy Centre (EMEC) 2020, Royal Haskoning and Sea Generation (Kyle Rhea) Ltd. 2013, SSE Renewables 2011, SAE Renewables 2011, Aquatera 2017, Davison and Mallows 2005, Orbital Marine Power 2018, West Islay Tidal Project Energy Park, EMEC Scapa Flow Scale Wave Test Site, Kyle Rhea Tidal Stream Array Project, Westray South Tidal Project, Atlantis Resources Corporation at EMEC, Tocardo InToTidal at EMEC, Strangford Lough - MCT (SeaGen), Orbital Marine Power O2 at EMEC
Wave, Tidal Operation & Maintenance Displacement

Potential displacement of essential activities due to the presence of devices and associated moorings/support structures.

Fish
Elasmobranch, large fish
None identified

None identified.

None identified

None identified

Wave, Tidal Installation, Decommissioning Habitat Loss

Direct loss of protected or sensitive sub-littoral seabed communities due to the presence of devices and associated moorings or support structures on the seabed.

Fish
Demersal fish
Design feature

Minimize footprint of anchors/foundations.

Could reduce effects on sensitive habitats

May impact technical considerations.

Aquatera Ltd 2011, Xodus Group 2019, Federal Energy Regulatory Commission (FERC) 2020, Wello Penguin at EMEC, EMEC Billia Croo Grid-Connected Wave Test Site, PacWave South Test Site
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Contamination

Potential for accidental or unplanned events which could lead to contamination of the marine environment.

Habitat
Mitigation

Where rock placement is used, ensure clean rock is used.

Reduces/removes risk of contamination/pollution from materials.

None identified

Wave, Tidal Installation, Operation & Maintenance, Decommissioning Barrier to movement

Potential barrier to movement due to the physical presence of devices and associated moorings/support structures, cables and electrical equipment.

Marine Mammals
Mitigation

Adherence to vessel management plan.

Minimizes the potential interaction between animals and construction or maintenance vessels.

None identified

OpenHydro and SSE Renewables 2013, Aquatera 2017, ScottishPower Renewables 2010, Xodus Group 2019, Fox 2019, Tocardo InToTidal at EMEC, Sound of Islay Demonstration Tidal Array
Wave, Tidal Operation & Maintenance Displacement

Potential displacement of essential activities due to the presence of devices and associated moorings/support structures.

Marine Mammals

None identified

None identified

Wave, Tidal Installation, Operation & Maintenance, Decommissioning Vessel disturbance

Disturbance at seal haul-out sites from project vessels.

Marine Mammals
Seals
Mitigation

Avoid transiting within 500m of known seal haul outs.

Reduces potential effects and is a relatively low cost measure.

None identified

SAE Renewables 2011, Argyll Tidal Limited 2013, Orbital Marine Power 2014, Orbital Marine Power 2010, Magallanes Renovables 2020, Royal Haskoning 2012, Xodus Group 2019, Atlantis Resources Corporation at EMEC, Argyll Tidal Demonstrator Project, Pelamis Wave Power P2 Demonstration at EMEC, Magallanes Renovables ATIR at EMEC, Oyster 800 at EMEC
Wave, Tidal Installation, Operation & Maintenance, Decommissioning Marine Non-Native Species (MNNS)

Potential for introduction of MNNS which can have an adverse impact on the native species at the site.

Reptiles
Compliance

Compliance with all relevant guidance (including IMO guidelines) regarding ballast water management and transfer of non-native species.

Reduce/remove risk of transfer and settlement of non-native species.

None identified

MeyGen 2012, Federal Energy Regulatory Commission (FERC) 2020, MeyGen Tidal Energy Project, PacWave South Test Site
Wave, Tidal Operation & Maintenance EMF

Impacts of electromagnetic fields from subsea cables on sensitive species.

Benthic
Benthic invertebrates
Design feature

Install cable protection, armor, rock placement, or other cable protection.

Reduce the level of EMF to surrounding water column and therefore any potential effects.

Reduces 'snagging risk' for vessels.

Creation of artificial habitat leading to greater fecundity in species.

May have an impact on surrounding benthic habitats and sensitive species.

Creation of artificial habitat may cause aggregation effect causing greater impact of EMF.

Increased cost to project.

Reduced possibilities for decommissioning.

...Read more

May have an impact on surrounding benthic habitats and sensitive species.

Creation of artificial habitat may cause aggregation effect causing greater impact of EMF.

Increased cost to project.

Reduced possibilities for decommissioning.

Direct disturbance/ loss of benthic communities.

Read less
MeyGen 2012, Foubister 2005, McGrath 2013, DP Energy Ltd. 2017, Federal Energy Regulatory Commission (FERC) 2020, MeyGen Tidal Energy Project, EMEC Fall of Warness Grid-Connected Tidal Test Site, Fair Head Tidal Array, Fair Head Tidal Array, PacWave South Test Site
Wave, Tidal Installation Barrier to movement

Potential barrier to movement due to the physical presence of devices and associated moorings/support structures, cables and electrical equipment.

Birds
Design feature

Site selection to avoid sensitive routes/areas.

Minimizes risk of development acting as a barrier to movement by avoiding migratory routes or other important sites.

None identified

Argyll Tidal Limited 2013, OpenHydro and SSE Renewables 2013, ScottishPower Renewables 2012, Fox 2019, Argyll Tidal Demonstrator Project, Ness of Duncansby Tidal Array
Wave, Tidal Operation & Maintenance Entanglement

Potential for marine animals to become entangled in device mooring lines and cables.

Birds
Diving birds
Monitoring, Design feature

Routine inspections of mooring lines. Implement features into existing control systems to detect entanglement events.

Remove/reduce risk of entanglement.

Likely to be required as part of the technical monitoring of the device and therefore not likely an additional cost.

Potential cost of measure for technology developers if not required as part of technical monitoring of the device.

Federal Energy Regulatory Commission (FERC) 2020, PacWave South Test Site