Abstract
Mitigation has been built into the Wave Dragon device and project design and especially throughout the EIA process, wherever possible. The following text consolidates the detail contained in the preceding chapters and presents the mitigation and monitoring proposals for the Wave Dragon project during the construction and operational phases of the development.