Abstract
Comprehensive management plays an important role in ensuring the normal operation of tide power stations. Effective measures are obtained through a thorough theoretical study and a long-term investigation, which include:
- Rational project arrangement
- Appropriate operation mode
- All sorts of essential engineering facilities
- Effective mechanical sand-proof methods
- Biological measures
All these above are the measures widely used in the tide power stations in China along the West Pacific coast and remarkable results have been achieved.