TY - RPRT TI - Thornton Bank Offshore Wind Farm Annual Report 2012 AU - C-Power AB - The 2012 Annual Report for the Thornton Bank Offshore Wind Farm documents a critical year of construction and expansion, focusing on the installation of 30 wind turbines and the offshore transformer station. The project continued its phased development towards the ultimate goal of 54 wind turbines with a total capacity of 325 MW.Key environmental monitoring activities included:Bathymetric surveysCable route assessmentsSedimentation and erosion monitoringCables burial depth trackingBy the end of 2012, a total installed capacity of 215 MW was operational. No major environmental incidents were reported, and the project maintained rigorous safety and environmental protocols. CY - Belgium DA - 2016/10// PY - 2016 SP - 15 UR - https://odnature.naturalsciences.be/downloads/mumm/c_power/bmmannualreport2012130315.pdf LA - English KW - Wind Energy KW - Fixed Offshore Wind KW - Habitat Change KW - Physical Environment KW - Sediment Transport KW - Water Quality KW - Human Dimensions KW - Environmental Impact Assessment ER -