TY - RPRT TI - Thornton Bank Offshore Wind Farm Annual Activity Report 2011 AU - C-Power AB - The 2011 Annual Activity Report for the Thornton Bank Offshore Wind Farm documents the ongoing development of the project, focusing on Phase 2 construction activities. The report details significant progress, including the successful installation of 196 foundation pin-piles ahead of schedule.Key environmental monitoring activities included:Bathymetric surveysCable route assessmentsSedimentation and erosion monitoringSea mammal protection during pile drivingNo major environmental incidents were reported. The project continued to advance towards its goal of 54 wind turbines with a total capacity of 325 MW, maintaining rigorous safety and environmental protocols. CY - Belgium DA - 2016/10// PY - 2016 SP - 20 UR - https://odnature.naturalsciences.be/downloads/mumm/c_power/bmmannualreport2011(public).pdf LA - English KW - Wind Energy KW - Fixed Offshore Wind KW - Habitat Change KW - Marine Mammals KW - Physical Environment KW - Sediment Transport KW - Water Quality KW - Human Dimensions KW - Environmental Impact Assessment ER -